Lakeside Landscaping in
2011
at the Lindberg Lake Wildwood
Resort
Part 12 -- Wall Details, Cobblestone Facing, Used Brick Cap
Work on Wednesday to Friday, June 15-17, 2011
Brandon
cuts slots for in-face LED lighting. |
|
Slots
and wiring are already in place in the wall on the other side of the
walkway. |
 |
Light fixture box on the opposite
side of above input wiring. |
 |
Thursday morning, June 16 --
manufactured cobblestone rock halves laid out for mortaring to outer face
of cinderblock wall. |
 |
Alfredo applies mortar ... |
 |
... then Tony presses halves into
place. |
 |
Work progressed
swiftly... |
 |
... and the facing was in place when
we returned at 1 p.m. Saturday, ... |
 |
... on both sides of the walkway to
the lake. Wall height is perfect for sitting on the used-brick cap.
The returns on each side of the first step have yet to be finished with
cobblestone and used brick. |
 |
Also in the two days we were away,
Tony and crew modified the Zirelli's landscaping to include this green. |
 |
Our wall sets off the greens nicely. |
 |
View from back of wall shows where
gravel, then soil, will be placed to drain the planting area on this side
of the walkway. |
 |