Deck and Interior Trim Begins
Pictures taken Friday, July 26
Posted August 4 when Oronet ftp Server came back on line
Mary and I didn't get out to the site while Craig and Jodie came up the July
21 weekend to select tile in Grass Valley and go over many upcoming construction
details with Roy. We therefore drove up the following Friday morning to check
out progress. I guess Pete and Roy and their crew decided to take a long weekend
because everything was closed up and empty when we arrived. There was much
progress since our last visit, some of which Craig and Jodie probably saw but
I'll report everything new since my last report to Craig. (I haven't posted the
rest of our July pictures because Oronet's Web server wasn't operational for
incoming material.)
Spandrel ball decoration along the veranda eves |
 |
Closer view of trim over the entry gable
|
 |
Still closer view of entry gable
trim |
 |
Spandrel balls looking frontward from
screen room |
 |
Materials and post holes for addition of barbeque
deck outside nook |
 |
Post holes aligned for deck addition to meet main
deck about halfway out |
 |
A great deal of progress is underway inside the house. Almost all the
interior doors are now hung or installed into sliding door pockets, and almost
all of the interior window casings are in place, sans trim. Materials, tools and benches
are set up for mass production of interior window trim.
Doors to entry hall closets and study
have been hung |
 |
Assembly line for window top trim |
 |
Window top trims with top-molding nail
blocks, sans top molding |
 |
Window casings, sans trim, in the nook
(typical for most of house) |
 |
Close-up of the only window trimmed out as
of Friday (in parlor) |
 |
The garage has been painted the
final-chosen base color. |
 |